# Backup and restoration policy with test plan

Template version: 3.0. Type: policy and operational procedure. Proposed profile: an organization of approximately 80 people whose operations, hosting or backups may be outsourced. This makes no claim about your environment. Internal owners retain business objectives, gap acceptance and recovery authorization even when a provider performs every technical operation.

After adaptation and adoption, “must” and operational instructions are internal requirements within approved scope. Before adoption they remain proposals. Frequencies, retention, RPO/RTO objectives, windows and criteria require local decisions. This model guarantees neither compliance, complete recovery nor a recovery time. A successful job alone does not establish that a service can be restored.

## 1. Purpose, scope and adoption decisions

The policy must cover data, configurations, applications and resources needed for priority activities. Identify what requires reconstruction, recovery or reinstallation from a controlled source. Scope must include outsourced services, endpoints holding unique data, directories, keys, catalogs and procedures where needed for selected recovery. Each item must be linked to an activity and an accountable owner.

Distinguish backup, replication, availability and archiving. These mechanisms may support different objectives; their presence does not make them interchangeable. A supplier retaining replicas does not automatically promise required recovery after deletion, compromise or error. Contracts and representative testing must confirm capabilities actually usable, including the organization's access and any provider assistance required.

| Parameter | Local decision | Authority | Evidence |
|---|---|---|---|
| Activities and scope | [TO COMPLETE: services, data, dependencies, exclusions] | Management and business | Map and accountable owners |
| Business objectives | [TO COMPLETE: acceptable loss and interruption] | Business owners | Approved tradeoffs |
| Copy strategy | [TO COMPLETE: frequency, media, separation, retention] | Internal owner | Verified capacity and protections |
| Recovery and testing | [TO COMPLETE: scenarios, order, criteria, windows] | Business and operations | Procedure and results |
| Document control | [TO COMPLETE: version, effect, approver, review] | Management | Accessible approved document |

Exclusions require reason, owner, risk and action. Verify information before the effective date: a new service, moved data or missing catalog may change recovery. Keep gaps visible. A list of backup jobs does not adequately describe protected services. Adoption must identify the services for which recovery remains unproven rather than silently count them as covered.

## 2. Responsibilities and absence arrangements

| Function | Responsibility | Reserved decision | Absence or failure |
|---|---|---|---|
| Management or delegate | Decide resources and residual risk | Accept gap against objectives | Named internal deputy |
| Business owner | Define priority, data and operation to recover | Validate minimum service and outcome | Deputy familiar with activity |
| Internal owner | Maintain strategy, coverage, contracts and evidence | Accept readiness and request correction | Deputy with procedure access |
| Provider or backup team | Execute, check, restore and provide evidence | Act within mandate only | Escalation and authorized operator |
| Security or incident lead | Assess compromise and safe recovery | Recommend protection and conditions | Identified alternate |
| Data owner and competent functions | Define sensitivity, access and preservation | Authorize uses and constraints | Alternate advice or owner |

The internal owner must check contracted scope, exclusions, support hours, restoration access, retrieval arrangements, return, costs and capacity dependencies. Obtain acceptance of tasks and evidence expectations. Supplier commitments must not become “demonstrated” business objectives without an end-to-end test. The organization must know who confirms the result when the supplier declares execution complete.

Deputies must find contacts, instructions, authority and approved secret-recovery arrangements without using the absent person's account. General documents must not contain those secrets. Assess dependence on the same email or directory as affected systems; test fallback rather than merely describe it. A recoverable backup with inaccessible authority or instructions is still an incomplete operational capability.

## 3. Define RPO/RTO from business needs

Business owners must explain acceptable data loss and interruption. Translate these needs into local objectives and define when measurement begins. Here RPO means the recovery-point objective governing data loss; RTO means the recovery-time objective. Values must not be selected solely from a software menu. Record the business reasoning and the activity that a proposed objective supports.

Operators must assess whether frequency, application consistency, volume, capacity, bandwidth, keys and access support objectives. Include preparation and dependencies within the approved measurement scope. If capacity is insufficient, present gaps and options. Management must decide resources, priority or risk; objectives must not silently change to match the latest result. Keep original and revised decisions distinguishable.

| Activity | Need to express | Technical verification | Decision if unmet |
|---|---|---|---|
| Order processing | Necessary data, acceptable loss, minimum operation | Consistent copy and representative transaction | Additional capability or accepted degraded service |
| Identity and administration | Access needed for other recovery | Directory, emergency accounts and authority | Revise order and dependencies |
| Hosted data | Period, granularity and available access | Actual export/restoration | Contract, other protection or accepted risk |
| Unique local data | Unsynchronized sources and owner | Inclusion or controlled retrieval | Remove uniqueness or document exclusion |

Each service needs a record covering owner, components, dependencies, objectives, copies, retention, sequence, method and test. Business and technical owners approve values jointly. Faster but inconsistent restoration may not meet the need; a recent file without its application or key is not a recovered service. Test evidence must therefore address both data and usable business function.

## 4. Design copies and separation

The strategy must identify copies for accidental deletion, equipment failure, site loss and compromise. Identify administrative control capable of modifying or deleting each copy. A connected offsite copy is not an offline copy. Check actual permissions and paths, including supplier and production identities. Location alone does not demonstrate separation from the credentials or administrative system under threat.

Examine claimed immutability: mechanism, configured period, who can change it, account deletion, keys and provider conditions. Do not use the label as an absolute guarantee. Modification protection and disconnected copies may be combined according to risk; choices and limits require approval and authorized tests. The organization must know which scenario each protection addresses and which remains uncovered.

| Protection | Question to verify | Evidence | Failure treatment |
|---|---|---|---|
| Network separation | Can production access reach the repository? | Configuration and authorized check | Restrict or explicitly accept risk |
| Distinct identities | Could a compromised account delete copies? | Roles and refusal test | Revise privileges and fallback |
| Modification protection | Who changes rules and for which period? | Settings, rights and planned test | Correct protection or limit claim |
| Offline copy | When is it truly disconnected and retrievable? | Inventory, custody and read test | Arrange rotation or another strategy |

Copies must receive protection appropriate to data sensitivity. Encryption requires recoverable keys and authorized access. Consider stolen media, corruption, supplier change and loss of identity. Protecting a copy does not remove the need to inspect its contents and know how to restore it. The strategy must distinguish confidentiality protection from usable recovery capability.

## 5. Protect backup resources and the recovery chain

Administer backup infrastructure with dedicated identities and limited privileges. Separate reading, daily operation, configuration and deletion where capabilities permit. Record sensitive changes and operations. Components must follow patch-management arrangements; protecting data while neglecting backup software leaves a critical dependency untreated. The internal owner must obtain evidence of maintained versions and relevant configuration changes from the provider.

Preserve resources needed to rebuild the facility: procedures, catalog, configuration, authorized installation media, licenses, equipment or capacity, import mechanisms and key recovery. Protect fallback resources while keeping them usable by authorized people. An encrypted copy without a recoverable key does not demonstrate restoration capability. The plan must name who can authorize and perform recovery of protected key material.

| Dependency stage | Necessary input | Check | Owner |
|---|---|---|---|
| Emergency access | Identity, delegation and authenticator | Authorized access without affected system | Internal owner |
| Infrastructure | Controlled network, time, storage and administration | Available resources, isolated if needed | Operator |
| Tool and catalog | Installation resources and copy references | Copy located and readable | Backup team |
| Keys and data | Authority, key and consistent point | Decryption and integrity checked | Custodian and operator |
| Application | Versions, settings and dependencies | Technical function, then business operation | Technical and business owners |

Sequence depends on the service; this chain is an adaptable model, not a universal order. Identify circular dependencies, such as instructions or secrets accessible only through the application being restored. Test alternative access and assign correction. Unresolved dependencies must remain explicit recovery reservations. A diagram does not replace an executable procedure and a tested route through its prerequisites.

## 6. Run backups and handle failures

Check jobs, actual included data, freshness and unusual volume, duration or configuration. Green status may exclude a volume or application. Compare actual scope with service records and recent changes. Link supplier messages to affected services rather than merely archive them. Monitoring must identify who receives a failure and what decision they are expected to make.

| Observation | Action | Evidence to retain | Escalation |
|---|---|---|---|
| Failed job | Identify state, cause and remaining usable copy | Error, service, last useful point | Internal and business owners according to exposure |
| Successful job, doubtful content | Compare inclusion with expected data | Scope difference and check | No complete-protection claim |
| Stale copy | Compare with approved objective | Last consistent point and potential loss | Protection decision or accepted risk |
| Unexpected change | Check authorization and effect | Configuration, actor and history | Security if compromise plausible |

Every failure requires owner, action and reassessment. Verify the next successful job before closure. When the service exceeds its approved objective, inform business owners of potential loss and obtain a decision with the relevant authority. Repeated retries without diagnosis must not conceal sustained absence of a usable copy. Keep previous errors so the history explains what happened.

Providers must confirm both execution and checks. If unavailable, use planned escalation and fallback. Alternative methods must not expose data through unauthorized export. Waiting risk and missing capability require an internal decision-maker, not silent acceptance. The owner must record what remains protected, what is uncertain and the next attempt or protective measure.

## 7. Select and authorize restoration

Requests must specify service, data, reason, desired point, destination and authority. Verify need, requester's rights and risk of overwriting newer data. Restoration to another user or system requires specific permission. Recovery must not become a route around ordinary access restrictions. Preserve the authorization so operators do not rely solely on an urgent request from an unverified account.

Identify copy, age, dependencies and application consistency. Approve environment, window, impact, success criteria and stop conditions. Preserve source state and useful current data as appropriate. Distinguish a restoration test, recovery of an item and complete service recovery; they need different evidence. The record must name the person who validates the selected level of recovery.

| Branch | Authority and preparation | Outcome check | Reservation |
|---|---|---|---|
| Deleted item | Data owner; separate destination where appropriate | Content and access accepted | Not proof of complete reconstruction |
| Technical outage | Business and operations; dependencies and capacity | Application and representative operation | Effects on recent data |
| Compromise | Incident lead; controlled environment | Security checks and conditional recovery | Copy may be contaminated |
| Supplier request | Mandate, scope and protected transfer | Readable receipt complete for requested scope | Unconfirmed capability or retrieval time |

## 8. Recover after compromise

The incident lead must coordinate preservation, backup protection and reconstruction. Copies may contain malicious implants or hostile configuration; age or readability does not establish cleanliness. Selection must use available evidence about the compromised period and record unknowns. An antivirus check alone is not a guarantee of safety. Explain which security checks support the chosen recovery point.

Use controlled reconstruction appropriate to capability: verified installation sources, reviewed configuration, checked data before import and administration independent of suspect access. The lead decides necessary restrictions and monitoring. Prepare backup-infrastructure isolation with operators and understand its effects instead of improvising during crisis. Protecting copies and preserving recovery capacity must be coordinated with business continuity and incident response.

| Recovery gate | Required evidence | Authority | If insufficient |
|---|---|---|---|
| Prepare | Identified administration, environment and copy | Lead and operator | Defer or restrict scope |
| Restore | Justified method, keys and point | Authorized operator | Keep error and reassess |
| Verify | Integrity, access, data and business function | Technical and business owners | Repair, change point or degrade service |
| Reconnect | Suspect access addressed, risks and monitoring | Recovery authority | No expansion without decision |
| Finish | Criteria met; remaining work assigned | Management or delegate | Explicit residual-risk acceptance |

Recovery does not replace investigation or treatment of hostile access. Business owners must understand what returned and what remains missing. Define stop conditions if suspicious signs appear. A technically completed rebuild must not be called normal service before agreed validation. Keep security and business reservations visible in the authorization to expand or reconnect.

## 9. Test capability, not merely a copy

The program must cover representative risks: file, application, identity dependency, loss of ordinary tools and cyber recovery where relevant. Select tests with business and operations, decide local scope and frequency and explain exclusions. A file test must not be presented as full reconstruction. Prioritize tests that exercise critical dependencies and previously unproven assumptions.

Authorization must specify test data, environment, real-message risks, temporary access, stop conditions and end-of-test deletion. Avoid reactivating suspect accounts, sending to real recipients or overwriting production. Record stage start and end within the measured scope. Include waiting and preparation rather than measuring only byte transfer. State any excluded time so comparisons remain interpretable.

- [ ] Confirm authority, scenario, scope and fallback people.
- [ ] Find procedure, catalog, copy, keys and capacity without blocking dependency.
- [ ] Check test separation and data protection.
- [ ] Execute stages; retain errors, durations and adjustments.
- [ ] Verify data, access and business operation.
- [ ] Compare observed loss and time with approved objectives.
- [ ] Assign gaps and schedule another check.
- [ ] Remove temporary access, delete test data and confirm closure.

Another person must be able to understand what the report actually demonstrates. Identify service, point, environment, operator, reviewer, criteria, gaps and decision. Business owners must accept or reject the result. An inconclusive test can be valuable when it exposes a specific dependency and produces verified correction. A completed report without evidence must not substitute for the exercised capability.

## 10. Complete fictional recovery scenario

Fictional Atelier Rivage has approximately 80 staff and must recover order processing after suspected compromise. Its business owner has set local objectives without universal values. The provider has copies, but the initial procedure depends on unavailable email. The deputy uses a controlled fallback copy. This scenario is not customer experience or evidence that a real deployment meets any target.

| Fictional stage | Observed state | Decision and owner | Evidence |
|---|---|---|---|
| Preparation | Catalog available; email unavailable | Lead uses fallback channel and procedure | D-01, authorized access tested |
| Copy selection | Recent point falls in suspect period | Security reserves its use; another point examined | E-01, reasons and unknowns |
| Reconstruction | Tool and keys recovered in separate environment | Provider executes mandate | E-02, reading and decryption |
| Business test | Test order works; attachment missing | Business rejects normal service and accepts bounded degradation | D-02, assigned gap |
| Validation | Missing data recovered; check repeated | Authority expands with monitoring | D-03, check and remaining risk |

Acceptance requires the deputy to explain copy selection, locate decryption authority and show why the first result was not complete recovery. Distinguish a backed-up workload, recovered data and validated service. Identify correction and next check instead of declaring success because the tool finished. The exercise must preserve the rejected initial acceptance and the reason for the later decision.

## 11. Adaptable registers and exceptions

| Blank service record | Local value | Owner | Verification |
|---|---|---|---|
| Need and dependencies | [TO COMPLETE: activity, minimum, order, suppliers] | [TO COMPLETE] | Business and technical assessment |
| Objectives | [TO COMPLETE: RPO/RTO, measurement start, reason] | [TO COMPLETE] | Internal approval |
| Copies and access | [TO COMPLETE: frequency, separation, keys, retention] | [TO COMPLETE] | Read and refusal tests |
| Restoration | [TO COMPLETE: method, destination, checks, stop] | [TO COMPLETE] | Technical and business result |
| Test and gaps | [TO COMPLETE: scenario, observations, decision, follow-up] | [TO COMPLETE] | Acceptance and correction |

| Exception | Completed fictional example | Local adaptation | Decision-maker |
|---|---|---|---|
| Unmet requirement | No disconnected copy for a secondary service | [TO COMPLETE] | Internal authority |
| Compensation | Protected copy and restricted access tested; limitation retained | [TO COMPLETE] | Security and business consulted |
| Risk and exit | Excessive privilege may still destroy copies; change planned | [TO COMPLETE] | Named acceptance |
| Expiry and check | Actual local date required before signature; reassess after change | [TO COMPLETE] | Action owner |

Exceptions must state cause, scope, risk, verified compensation, owner, expiry and review. A provider cannot alone accept gaps against business objectives. At expiry obtain correction or a new decision; silent renewal is prohibited. Assumed protection must not be called verified compensation. The register must expose which failure remains possible and how the decision-maker understood that limitation.

## 12. Oversight, enforcement and revision

At [TO COMPLETE: body and cadence], report uncovered services, old copies, failures, insufficient capacity, overdue tests and exceptions. Indicators must state population, period and limits. Keep “job executed,” “data recovered” and “service restored” distinct. Unknown state must not count as compliant. Management must receive the decision required and the consequence of leaving the gap unresolved.

Examine unauthorized restoration, excessive access or ignored failure with competent functions. Protect data, assign correction and verify follow-up. This model creates no automatic sanction. Responses follow internal rules, contracts and applicable obligations while preserving useful evidence. Supplier actions and internal decisions must remain distinguishable when the cause or treatment of a process gap is reviewed.

Review after incidents, inconclusive tests or changes to dependencies, identities, keys, suppliers or objectives. Retain author, reason, approver and superseded version in [TO COMPLETE: repository, access, retention]. Distribute approved instructions to operators and deputies. Verify return and recovery during supplier exit before losing necessary technical resources. A replacement contract must not erase the history of unproven recovery capability.

## Primary sources and limitations

The [ANSSI backup guide, version 1.1 of 27 November 2025](https://messervices.cyber.gouv.fr/documents-guides/anssi_fondamentaux_sauvegarde_systemes_dinformation_v1.1.pdf), notably §2 and R1–R32, addresses objectives, separation, identities, testing, recovery order and compromised copies. [NIST SP 800-34 revision 1](https://csrc.nist.gov/pubs/sp/800/34/r1/upd1/final), published in 2010, provides planning and testing context requiring adaptation to current technology.

Proposed roles, tables, scenarios and criteria are organizational choices, not guarantees or certification. Verify provider mechanisms, application consistency, safety and obligations in your environment. Objectives may require capability beyond backup alone. Local approval and a useful document do not replace testing of the actual recovery chain.
