# Vulnerability and patch management policy

Template version: 3.0. Type: policy and operational procedure. Proposed adoption profile: an organization of approximately 80 people, with user devices, hosted services and IT operations potentially managed by a supplier. This profile makes no statement about your business. An internal owner retains prioritization, interruption, exception and risk-acceptance decisions even when discovery and deployment are outsourced.

After adaptation and adoption, “must” and the instructions below apply within approved scope. The policy owner must complete fields, confirm capabilities and contracts and obtain named approval. This policy guarantees neither compliance nor absence of vulnerabilities. Schedules require local decisions; no universal remediation deadline is introduced. The document must not be presented as proof that the adopting organization already performs its controls.

## 1. Purpose, scope and adoption

This policy organizes discovery, assessment, treatment and verification of exposure. It covers systems, applications, libraries, network devices, firmware and services included in inventory. Distinguish what the organization administers, what the supplier patches and which settings remain the organization's responsibility. Describing a service as cloud-hosted is not a sufficient allocation of responsibility.

Scope must address remote devices, infrequently connected equipment, administrative workstations, backup infrastructure, exposed services and relevant development components. Industrial or sensitive systems follow methods approved by their safety owners. Exclusions retain asset, reason, owner and risk treatment. An asset must not disappear from inventory merely to improve an indicator.

| Adoption decision | Local value | Authority | Evidence |
|---|---|---|---|
| Covered services and assets | [TO COMPLETE: inventories, exclusions, supplier boundaries] | Technical and business management | List reconciled with contracts |
| Owners and deputies | [TO COMPLETE: lead, operators, security, approvers] | Management | Delegation and acceptance |
| Priorities and commitments | [TO COMPLETE: levels, starting event, local targets] | Risk authority | Exposure and resource justification |
| Windows and emergencies | [TO COMPLETE: cycles, authorization, stop and fallback] | Business and operations | Tested procedure |
| Version and review | [TO COMPLETE: local version, effective date, review, signatures] | Policy owner | Approved distributed document |

Before declaring the process operational, follow an advisory through closure on a representative service, including a failure and an exception. If the IT provider cannot show deployment state or inventory coverage, record and treat that limitation before promising a service level. A tool's output is an input to acceptance, not a substitute for the acceptance decision.

## 2. Roles and decision boundaries

| Function | Responsibility | Reserved decision | Absence or failure |
|---|---|---|---|
| Internal owner | Maintain scope, commitments, exceptions and reporting | Accept process readiness | Named deputy with register access |
| Security or MSSP | Assess advisories, plausible exploitation and priority | Recommend; cannot alone accept business risk | Security fallback and contract escalation |
| IT provider or operator | Check versions, test, deploy and supply evidence | Changes within approved mandate only | Authorized alternate |
| Business owner | Assess interruption and verify service | Accept window and functional outcome | Named business deputy |
| Risk authority | Decide deferral, compensation and retirement | Explicitly accept residual risk | Planned delegation, never silent approval |
| Supplier management | Reconcile support, contract and stated capability | External commitments within authority | Replacement contact |

Each campaign must tell the supplier which assets, action, window, constraints, success criteria and escalation apply. Obtain acceptance of both task and evidence expectations. A general commercial agreement does not establish who may act on an application, device or dependency covered by a separate contract. Shared responsibilities must be resolved before the planned change.

If a decision is missing, contact the deputy and record the delay. Preauthorized measures may proceed within their limits; others require an explicit decision. Inform the business owner of continuing exposure and interruption risk. Urgency must not allow a supplier to accept either risk alone. Keep the authorization connected to the affected assets and the planned intervention.

## 3. Discover and reconcile assets

Reconcile available inventories: endpoint management, directory, network equipment, hosting, applications, licensing and contracts. Identify assets present in one source but absent from another. Record coverage, observation dates and categories not observable. A powered-off or unreachable device must not be considered patched or silently excluded from scope.

For each asset, retain stable identifier, service, owner, environment, observed version, exposure and maintenance method. Link software dependencies to the production application or image. Distinguish installed version, available package and running instance. Check tool-generated inventory against a risk-appropriate sample before treating it as the sole reference. Preserve contradictory observations for resolution rather than choosing the more favorable one.

| Discovery gap | Required action | Evidence | Escalation |
|---|---|---|---|
| Ownerless asset | Identify service and accountable person; keep visible | Identifier, sources, attempts | Technical leadership |
| Conflicting versions | Check locally or with vendor | Method and effective version | Security if urgent |
| Missing remote device | Contact manager; arrange return or authorized check | Last observation and decided restriction | Internal owner |
| Unsupported component | Confirm support and treatment options | Supplier reference and plan | Risk authority and business |

Active assessments require authorized scope, a window and stop conditions. Fragile systems require operator-approved methods. Results must state what was authenticated or actually checked. A scan with no findings cannot alone distinguish no vulnerability, insufficient access or incomplete coverage. The assessment owner must explain limits before a result supports a treatment or closure decision.

## 4. Assess advisories and set priority

Security must monitor vendor advisories, [CERT-FR advisories](https://cert.cyber.gouv.fr/avis/) and selected primary sources. Retain reference, advisory revision, consultation date and proposed applicability. Revised publications require reassessment of affected findings. An old screenshot must not replace current treatment instructions. The analyst must connect the advisory to the particular product and configuration rather than rely on a similar name.

The [CISA Known Exploited Vulnerabilities catalog](https://www.cisa.gov/known-exploited-vulnerabilities-catalog) records known exploitation and can inform priority. Absence from it does not establish that a vulnerability is unexploited. Agency-specific deadlines do not automatically apply to the organization. Combine threat, exposure and consequences rather than copy a deadline without checking its scope.

| Situation | Assessment | Proposed decision | Check |
|---|---|---|---|
| Observed or credible exploitation on exposed asset | Applicability, access, privileges, compromise indicators | Urgent treatment and incident assessment | Named protection and verification |
| Applicable vulnerability on critical service | Actual access path, protections and impact | High priority according to local risk | Explicit window or compensation |
| Less exposed asset with confirmed defect | Dependencies and movement opportunities | Justified planned campaign | Approved target, not neglect |
| Unknown applicability | Missing version, configuration or conditions | Bounded investigation with protective priority | Next information, owner and reassessment |

The priority record must explain reachability, potential consequences and protections actually checked. Technical severity does not describe business impact alone. Distinguish assumed and tested protection. Missing information requires a protective measure or explicit acceptance of waiting by the competent authority. The reasoning must be understandable to a replacement analyst, not just an unexplained priority label.

Local targets must define their starting event: detection, confirmed applicability or treatment availability. Preserve these dates separately. An extension must not artificially reset the finding's age. Changes in threat or exposure may accelerate an already approved ordinary window. The lead must record both the revised decision and any business or resource constraint that remains unresolved.

## 5. Validate treatment and prepare change

Operators must confirm product, version, configuration, prerequisites and dependencies before selecting a package or mitigation. Read vendor instructions and verify provenance and integrity using available methods. Link download information, intended version and known restrictions to the ticket without attaching administrative secrets. Uncertain authenticity is a stop condition, not an acceptable shortcut justified by urgency.

Testing must represent the affected service, authentication, application access, scheduled work, backup and monitoring where relevant. Define stop criteria and a realistic fallback. A successful backup job does not itself demonstrate restoration. Rollback may be unavailable or restore vulnerability; decide that risk before intervention. The test report must identify which functions were exercised and which were not.

| Preparation check | Owner and input | Required result | Failure and decision |
|---|---|---|---|
| Applicability | Operator; version and advisory | Confirmed defect or reasoned exclusion | Reassess priority; no empty closure |
| Treatment provenance | Operator; vendor channel | Identified package and validation | Stop suspect installation |
| Technical test | Operator; environment and criteria | Recorded results, version, effects | Revise plan or compensate |
| Business validation | Owner; representative operation | Expected function demonstrated | Reject broad rollout or decide degraded service |

Prepare a change record another operator can use: targets, sequence, justified duration estimate, stop conditions, contacts and completion check. Estimates are not guarantees. Missing skills require an authorized fallback or deferral under a risk decision, not permission to improvise. The lead must ensure that decision-makers understand limitations before authorizing the window.

## 6. Run an ordinary campaign

Group assets by technical characteristics, criticality and maintenance constraints. Validate group membership: laptops, business servers and network equipment do not necessarily share a method. Preserve the starting population so actual coverage can be measured. Assets discovered during the campaign require an explicit inclusion or follow-up decision rather than disappearing between successive reports.

Begin with the approved representative group, check outcomes and expand according to criteria. Include required restarts, reloads and redeployment. A library updated in a repository but not in running instances remains incomplete treatment. Stop expansion when unexpected results mean risk is no longer understood. The operator must keep the lead informed of affected service and current state.

- [ ] Confirm population, owners, dependencies and window.
- [ ] Check operator access, package and current instructions.
- [ ] Confirm fallback resources and stop conditions.
- [ ] Inform people affected by planned interruption.
- [ ] Execute the pilot and retain results and errors.
- [ ] Verify effective version and business operation before expansion.
- [ ] Record successful, failed, excluded and unobserved assets.
- [ ] Assign retry actions and report reservations to the lead.

Closing the window must produce explicit status. A powered-off or inaccessible asset receives follow-up, not presumed success. Unexpected changes require explanation and authorization under the applicable procedure. If rollback was used, verify resulting exposure and temporary protection separately. The report must state the service's actual operating state, not merely whether the installation tool finished.

## 7. Emergency, suspected exploitation and no-patch treatment

During an emergency, security, operations and business owners must choose available protection: accelerated patching, access restriction, disabling a function or retiring service. Record threat, measure impact and next check. Missing ordinary testing requires focused testing and an explicit decision; it must not be hidden. Supplier requests must specify exactly which emergency authority was invoked.

Suspected exploitation must initiate incident response. Coordinate patching and investigation to preserve useful evidence and address access already obtained. Fixing the defect does not establish that an attacker is absent. Identify who investigates, who protects service and who authorizes its return. A patch ticket must not silently replace the incident record and its remaining questions.

| Emergency branch | Minimum action | Verification | Escalation |
|---|---|---|---|
| Available, testable patch | Test essential functions; expand progressively where possible | Actual version and service | Failure to business and security |
| No patch | Check proposed exposure reduction | Access or function actually restricted | Accepted risk, target and vendor follow-up |
| Service cannot stop | Define degraded operation or suitable protection | Observable compensation | Risk authority, not supplier alone |
| Compromise indication | Open incident; coordinate collection and containment | Known and unknown extent recorded | Incident lead |

Temporary protection requires an owner and replacement condition. Once durable treatment is available, decide when to apply it and withdraw unnecessary compensation. Removing a restriction before confirming the patch may restore risk; keeping an emergency measure indefinitely may impair service. Record the transition so another operator can verify that neither step was assumed complete.

## 8. Legacy assets, exceptions and accepted risk

Unsupported or unpatchable assets require a specific record: essential use, owner, dependencies, replacement options and exposure. Operators must explain why patching is impossible and what was tested. Business owners must assess restricted use or replacement. “Critical application” alone does not justify an exception. A long-lived limitation requires an explicit plan, not repeated administrative renewal.

| Exception field | Completed fictional example | Blank local value | Validation |
|---|---|---|---|
| Asset and constraint | Old test gateway; incompatible business software | [TO COMPLETE] | Owner and evidence |
| Compensation | Restricted approved-network access; logs checked | [TO COMPLETE] | Test and operator |
| Accepted risk | Restriction failure or use outside scope | [TO COMPLETE] | Named internal authority |
| Exit and expiry | Replacement linked to business project; review before locally set expiry | [TO COMPLETE] | Owner and next decision |

Expiry must be a real local date completed before approval. The example does not waive that decision. Verify compensation at the approved frequency and after threat changes. At expiry provide correction, retirement or new justification. Silent renewal and acceptance by the operator alone are prohibited. Keep the original exposure and treatment history available throughout the exception.

## 9. Verify and close using evidence

Link each asset to its finding, change and performed check. Security must assess whether evidence addresses the defect: running version, configuration, restart or authorized reassessment. Closure must distinguish confirmed correction, temporary protection, accepted risk, demonstrated non-applicability and unknown state. These are not interchangeable successes and must remain separate in management reports.

| Outcome | Required evidence | Next action | Closure authority |
|---|---|---|---|
| Corrected | Effective treatment on actual target | Monitor side effects | Process owner |
| Failed | Error and current state preserved | Decide retry or compensation | Lead, with business if affected |
| Not applicable | Verified version/configuration and reason | Reassess on change | Security and owner |
| Unknown | Missing verification explicit | Obtain access or other evidence | Never close as corrected |
| Temporarily protected | Verified measure and limits | Plan patch or retirement | Risk authority |

Reconcile supplier “installed” reports with the intended population. Identify absent rows, duplicates and conflicting versions. Errors must not vanish on retry. History must explain the exposure period without inventing a protection date. If the supplier cannot provide evidence, the internal owner must arrange another check or preserve unknown status with a decision on continued operation.

## 10. End-to-end fictional scenario

Fictional Atelier Rivage uses a remote portal managed by an IT supplier. A primary advisory may affect its version. The MSSP identifies plausible exposure; the supplier's inventory is old. The internal lead rejects the stale list as proof and requests a current observation. This is an exercise, not a customer result or a claim about a particular product.

| Stage | Fictional decision | Expected evidence | Acceptance criterion |
|---|---|---|---|
| Discovery | Confirm asset and effective version | Observation linked to portal identifier | Applicable advisory or reasoned exclusion |
| Priority | Exposure justifies urgency | Access path and limits stated | Authority and next check named |
| Treatment | Temporary restriction, then tested patch | Restriction test and pilot result | No protection claim without verification |
| Deployment | One node succeeds; another remains unreachable | Two distinct states | No claim of complete campaign success |
| Closure | Remaining node checked after authorized retry | Running version and business test | History retained; compensation removed by decision |

Acceptance requires a deputy to explain why the second node was not corrected, locate the accepted risk during the delay and demonstrate final verification. They must reject a favorable percentage obtained by excluding the unreachable node. They must also distinguish vulnerability treatment from investigation of possible exploitation. The exercise fails if either decision is replaced by a tool's success label.

## 11. Working registers and adoption test

| Finding record | Required information | Owner | Completion check |
|---|---|---|---|
| Identification | [TO COMPLETE: advisory, revision, asset, version, service] | [TO COMPLETE] | Applicability and coverage |
| Decision | [TO COMPLETE: exposure, impact, priority, target] | [TO COMPLETE] | Approved reasoning |
| Change | [TO COMPLETE: test, window, sequence, stop, fallback] | [TO COMPLETE] | Approval and outcomes |
| Verification | [TO COMPLETE: method, date, effect, reservations] | [TO COMPLETE] | Explicitly qualified status |
| Exception | [TO COMPLETE: compensation, risk, decision-maker, expiry] | [TO COMPLETE] | Review and exit |

Before adoption, test an applicable advisory, a version false positive, a remote asset, a failed deployment and a legacy asset. A replacement owner must locate decisions and reactivate the supplier task. Document unavailable capabilities. Another tool does not replace allocation of responsibility and verification of changes. Store a completed test example alongside the blank register for future operators.

## 12. Assurance, enforcement and revision

At [TO COMPLETE: body and cadence], report coverage, overdue findings, unobserved assets, expiring exceptions and unverified treatment. Every indicator must identify period, population and source. Gaps require assigned correction or accepted risk. Unknowns must remain visible even when they make results look worse. Reports must allow management to identify the decision needed, not merely present counts.

Unauthorized intervention, unsupported closure and expired exceptions must be examined by the owner. Decide immediate protection, operational consequences and follow-up with competent functions. This policy creates no automatic sanction; consequences follow internal rules and applicable obligations. Suppliers must participate in correcting their own process gaps, with internal acceptance of the corrective evidence.

Review after incidents, significant failure or changes in technology, supplier or responsibility. Preserve author, reason, approval and superseded version in [TO COMPLETE: repository, access and retention]. Inform operators of new rules. Reconfirm targets and frequencies against actual risk rather than simply carrying them forward from an old document.

## Primary sources and limitations

[NIST SP 800-40 revision 4, April 2022](https://csrc.nist.gov/pubs/sp/800/40/r4/final), particularly §2.2–2.3 and §3.2–3.6, addresses inventory, risk response, deployment, verification, maintenance groups and exceptions. [NIST SP 800-61 revision 3](https://csrc.nist.gov/pubs/sp/800/61/r3/final) provides incident-response context when exploitation is suspected.

The matrices, roles, examples and local requirements are a Seculogik proposal, not universal normative reproduction of these sources. Check current vendor instructions and safety constraints before acting. No tool, provider or percentage guarantees absence of defects or removal of hostile access established before treatment.
